Constructing a Work Breakdown Structure
Create a WBS for “Interior Construction” for the Smith Family Home that we are building in the Recorded Lectures. The WBS needs to be between 20 and 30 lines long and at least 3 levels deep. It should describe the work – all the work but only the work – to build the interior of the Smith Family home.
Don't use plagiarized sources. Get Your Custom Essay on
Constructing a Work Breakdown Structure
Just from $13/Page
The outline below is setup to add the correct WBS code to each element. Replace “First Deliverable” and “Sub Deliverable” with your own material, then continue building the WBS.
- Interior Construction of Smith Family House
- First Deliverable
- Sub Deliverable
- First Deliverable